Velo Valero

The Official Cycling Team of Valero Energy Corporation
The Pedal Power to Take You Anywhere!
Welcome to Velo Valero Sign in | Join | Help

Files

Most Downloads | Most Popular | Most Recent | Most Comments

Most Downloads

File Date Added Downloads  
Map of rides in the Valero HQ area.
05-30-2006 760 Download
File Size 62.3kB
Last Uploaded: 07/09/2007 15 Week Training Journal for the 2007 MS 150 Bike to the Beach. 15 week program begins the week of July 9th, and ends the week of 10/15, the week before the Valero MS 150. (NOTE...
06-14-2007 589 Download
File Size 53.5kB
Approximately 45 miles with a few challenging hills.
08-21-2006 455 Download
File Size 37.4kB
03-14-2007 437 Download
File Size 150.2kB
Directions to Judson HS Parking Lot.
05-11-2006 434 Download
File Size 83.2kB
Popular Northeast San Antonio ride that starts from the Valero Retail Distribution Center (RDC).
09-07-2006 422 Download
File Size 50.4kB
04-17-2007 408 Download
File Size 29.3kB
Location of parking lot adjacent to the Fiserv Health Building, across the street from the Chevron Station on Main Street in Boerne.
07-26-2006 404 Download
File Size 175.2kB
A map of the popular Comfort to Kerrville route. The full route is approximately 45 miles. A shorter ride (approx. 32 mi.) can be made by turning right from Rt. 173 onto River Road and back through Center...
04-07-2006 397 Download
File Size 71.9kB
07-03-2007 387 Download
File Size 103kB
Powered by Community Server (Non-Commercial Edition), by Telligent Systems